#106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

#106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

0 Calificaciones
0
Episodio
106 of 123
Duración
6min
Idioma
Inglés
Formato
Categoría
Economía y negocios

In this first episode of the mini series Why Choose the German RS Demountable Flood Barrier?, Dr. Andreas Klippe — Dr. Flood, German engineer, entrepreneur, and book author — explains why the first flood is always too late. Learn why waiting until after disaster strikes costs more, disrupts operations, and puts safety at risk. This introduction sets the stage for the global success stories and proven engineering principles in the episodes ahead.


Escucha y lee

Descubre un mundo infinito de historias

  • Lee y escucha todo lo que quieras
  • Más de 1 millón de títulos
  • Títulos exclusivos + Storytel Originals
  • Precio regular: CLP 7,990 al mes
  • Cancela cuando quieras
Suscríbete ahora
Copy of Device Banner Block 894x1036 3
Cover for #106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

Otros podcasts que te pueden gustar...