No transition without transmission? The grid equipment bottleneck explained

No transition without transmission? The grid equipment bottleneck explained

0 Calificaciones
0
Episodio
277 of 328
Duración
28min
Idioma
Inglés
Formato
Categoría
Economía y negocios

On this week's episode of Energy Evolution, we lay out why grid equipment has become a bottleneck in the deployment of renewables, and why it takes time to ramp up manufacturing. Andreas Schierenbeck, CEO of equipment provider Hitachi Energy, shares industry perspectives on investment trends and the operational realities of scaling up industrial manufacturing of transformers, while S&P Global Commodity Insights analyst Cormac Gilligan explains why demand for grid infrastructure has outpaced supply. Energy Evolution has merged with Platts Future Energy, and episodes are now published on Tuesdays. Links: Register for CERAWeek


Escucha y lee

Descubre un mundo infinito de historias

  • Lee y escucha todo lo que quieras
  • Más de 1 millón de títulos
  • Títulos exclusivos + Storytel Originals
  • Precio regular: CLP 7,990 al mes
  • Cancela cuando quieras
Suscríbete ahora
Copy of Device Banner Block 894x1036 3
Cover for No transition without transmission? The grid equipment bottleneck explained

Otros podcasts que te pueden gustar...