격이 다른 오디오북 생활을 경험해보세요!
논픽션
In their book ‘Gresley’s Silver Link’ the authors analyzed the evolution of the A4s Gresley’s and their service up to Gresley’s death in 1941. This book takes this compelling story from the early years of the war up to their demise in the 1960s
After four years of service pulling the LNER’s most prestigious trains the A4s took on a more utilitarian role and for six years worked hard to support Britain’s war effort. From this they emerged bowed, but unbeaten, although in an extremely jaded condition. Once restored they took up where they had left off in 1939 and did exceptional service for the rest of their days.
With the help of previously unpublished material the authors analyze the second phase of the A4s careers, first as LNER engines, then, from 1948, under British Railways management. Without a diesel or electric fleet of engines to replace them they entered a second golden age of fast running in the ‘50s. Then in the ‘Swinging Sixties’ they faced, as some thought, a premature end as part of a much delayed modernization program. Until withdrawn from service they continued to astound their footplate crew and performed exceptionally well, even when maintenance standards had slipped and their condition had deteriorated. They were thoroughbreds and have become a fitting memorial to the master engineers who produced and sustained them for 30 years or more.
© 2025 Pen & Sword Transport (전자책 ): 9781399073448
출시일
전자책 : 2025년 4월 22일
태그
국내 유일 해리포터 시리즈 오디오북
5만권이상의 영어/한국어 오디오북
키즈 모드(어린이 안전 환경)
월정액 무제한 청취
언제든 취소 및 해지 가능
오프라인 액세스를 위한 도서 다운로드
친구 또는 가족과 함께 오디오북을 즐기고 싶은 분들을 위해
2-3 계정
무제한 청취
2-3 계정
무제한 청취
언제든 해지하실 수 있어요
2 개 계정
17900 원 /월한국어
대한민국